With less than a fortnight to go until the opening of Cambridge South, the wait is almost over. In this video, we’ll discuss everything you need to know about the new station, from its background and justification, to the facilities it will offer to passengers, and even when the first trains will actually run!

When the station opens, I will be visiting it to make a video for my vlogs channel here: youtube.com/@MikeWillSee

Thank you to @OnlyTheRightTrack and @fynnjonestrains for contributing footage towards this video. Make sure to check out their channels for more amazing railway content!

SOURCES/ATTRIBUTIONS:

https://www.railmagazine.com/news/cambridge-south-to-become-first-gbr-branded-station-when-it-opens-next-month

Cambridge South station


https://www.networkrailmediacentre.co.uk/news/together-we-public-artwork-installed-at-cambridges-newest-station
https://www.gov.uk/government/news/next-stop-cambridge-south-new-stations-opening-date-revealed
https://www.realtimetrains.co.uk/search/simple/gb-nr:CMS/2026-06-28/0600

Mayor backs Cambridge South station as infrastructure that powers growth


https://cambridge-biomedical.com/campus-overview/

Share.

38 Comments

  1. Station looks great and well it's also great to see so many green and Sustainability parts incorporated into the construction.
    I won't be able to attend sadly as I would love to be there for the opening. But I wish the station every best and great to see it's designed with future growth in mind

  2. The logic behind the lack of parking area is that a, there is no space, and B, there is sufficient parking or connectivity to parking in the surrounding area, at the biomedical campus and via bus.

    That “art” installation is ridiculous, and a waste of funding.

  3. Now that this is nearly out of the way I hope they start investing in the roads again as the condition is some of the worst in the country.

  4. Impressive on the one hand but all that Green stuff is delusional. How many days into construction were all the so-called benefits annulled by the carbon created? It's the equivalent of waterproofing a handrail on the Titanic as it's sinking.

  5. I live very near this new station and plan to use it to travel to work near Cambridge North instead of using my car. Hopefully there’ll be plenty of people doing the same/similar route.

  6. Quarter of a billion quid? And AZ contributing say 1% of that… Are we selling our souls to the devil? Sure it's a nice station hopefully it'll be here in 100 years time, but with all the other priorities people might like to see being addressed? As a Cambridge resident I feel uneasy about this.

  7. Cambridge South once it opens it will serve Cambridge Biomedical Campus and Addenbrooks Hospital. I really do like how the new railway station looks. And there are talks about Cambridge having a 4th railway station that will be located close to Cambridge City Airport. And to be part of the East-West rail link connecting Oxford with Cambridge and East Anglia.

Leave A Reply