Very rough timeline:
Unpacking parts and organizing: 2 hours
Polishing handles: 8.5 hours
Piston o-ring, front cap and rear cap install: 2 hours
Piston prep: 4 hours
Part cleanup and magnet install: 12.5 hours
Pin install: 8.5 hours
Body polish: 8 hours
Final polish: 4 hours
Valve rubber punch: 20 min
Install: presta o-ring, cap o-ring, valve: 4.5 hours
Lube and thread lock rear cap: 6.25 hours
Test: 4 hours
Fold manual, packing slip, pack, add label, final pump clean: 8.25 hours
Redbull final count: 400 oz Gas station Jerky: 12 lbs
Conclusion: I was able deliver (mostly) on time and then I camped for 2 days in the colorado mountains to deal with the trauma.
Thanks to everyone that supported my project