
Photo gallery: https://imgur.com/a/3Sz4G1W
Complete with Surron tracks ~24 hours after the first rain that I used for digging. Surfaced lips the first sesh, then landings and corners the second sesh.
Test runs on the lines that were dry: https://www.youtube.com/shorts/wp6Q2HLFfjg
by GundoSkimmer