A bike ride southbound on the ‘Yellow Brick Road’ aka part of the former Stockport Branch Canal. It’s been resurfaced and lighting has been added. I think the railway bridge part is still to come, and some of the lighting hasn’t been fully installed yet.
The improvement works were consulted on in 2020, and mostly completed in 2025. More info can be found here: https://beeactive.tfgm.com/schemes/manchester/manchester-cycleway-yellow-brick-road/ and a map of the improvements planned here: https://www.manchester.gov.uk/info/200024/consultations_and_surveys/8185/fallowfield_loop_and_yellow_brick_road_consultation_second_stage/4 and here: https://www.google.com/maps/d/embed?mid=13heugeg-ogEqqni2R7C9wFPi0BBvNiBY&ll=53.45937844404402%2C-2.217321949999995&z=13